What is an advanced septic system?
Enhanced nutrient-reducing onsite sewage systems are designed to lower nitrogen entering groundwater. The approved treatment technology and design must meet applicable state and local requirements.
Who may need to upgrade by July 1, 2030?
Under Florida Statute 373.469, certain commercial properties and residential properties of 10 acres or less with existing septic systems in designated Indian River Lagoon protection areas must connect to available central sewer or upgrade to qualifying treatment that achieves at least 65% nitrogen reduction.
Check the state statute and Brevard County map for your parcel; other rules can apply based on timing, location and permit type.
Where to start
Check the parcel
Use Brevard's official map and confirm sewer availability with the relevant utility.
Investigate grant eligibility
Do not start work before receiving any needed grant approval and notice to proceed.
Speak with a qualified installer
Ask which approved technology fits the site and about operating costs, monitoring and maintenance.
Ready to discuss your options?
Tell us about the project when the referral intake goes live, and verify any contractor's credentials before hiring.
Project request